Contact Us
Maximo↔MS Project integrated planning & scheduling


This Maxavera® iPack provides robust integration between Maximo and Microsoft Project (MS Project). It intelligently transfers work orders, tasks, labor, crafts, PMs, equipment details and other Maximo information to MS Project where work can then be scheduled and resources optimized. After scheduling is completed, Maxavera® automatically sends relevant schedule dates, logic and resource assignment updates back to Maximo, keeping the two in sync.

Maximo users stay in Maximo, MS Project users stay in MS Project, and Maxavera® ensures that the two systems interoperate seamlessly.

Optimize Shutdowns, Turnarounds, and Outages
Organizations leverage this Maxavera® iPack to streamline and optimize planning and scheduling for plant shutdowns, turnarounds, outages, on-line daily maintenance and capital projects. Benefits include increased wrench time, reduced schedule backlog, improved controls, improved "what-if" planning capability, elimination of manual data entry and increased data accuracy.

Plug-and-Play Solution
Maxavera® delivers 90%+ of your Maximo-MS Project integration project requirements straight out of the box the day it is installed. It includes predefined best-practice field mappings, rules and transformation logic refined through years of delivering real-world solutions.

Flexibility
Most every customer has some level of requirements that are unique to their business such as custom fields, special mapping logic and processing rules. This is where Maxavera® shines even brighter! By far the most flexible and highly configurable solution in the industry, Maxavera® can be quickly configured to match your exact needs. From oil refineries to offshore platforms, nuclear power plants and defense contractor programs, Maxavera® has never met a business process it could not accommodate.

Reduced integration time, cost and risk
Maxavera® is a proven solution. It eliminates the unnecessary time, costs and risk of integration. It provides an exceptionally robust, high performance and supportable business solution at a fraction of the cost to implement and support.

Extensive version support
Maxavera® supports and extensive list of Maximo and Primavera versions, including Maximo 4.x, 5.x, 6.x, 7.x and Microsoft Project Enterprise Server 2007 and 2010, and Microsoft Project Client 2003, 2007 and 2010.